News

Explore our expert insights and analysis in leading energy and climate news stories.

Energy Explained

Get the latest as our experts share their insights on global energy policy.

Podcasts

Hear in-depth conversations with the world’s top energy and climate leaders from government, business, academia, and civil society.

Events

Find out more about our upcoming and past events.

About Us

We are the premier hub and policy institution for global energy thought leadership. Energy impacts every element of our lives, and our trusted fact-based research informs the decisions that affect all of us.

Nuclear Energy

Insights into Construction Delays at the Vogtle Nuclear Plant: Primary Sources of Delay Identified by the Independent Construction Monitor

Report by Matt Bowen & Rama T. Ponangi • November 15, 2026

Acknowledgments
This report represents the research and views of the authors. It does not necessarily represent the views of the Center on Global Energy Policy. The piece may be subject to further revision. The Center on Global Energy Policy acknowledges the Bernard and Anne Spitzer Charitable Trust and Ray Rothrock for their generous support of the research activities of CGEP’s Nuclear Energy Program. More information is available here.

CGEP’s Visionary Annual Circle

Corporate Partnerships
Occidental Petroleum Corporation

Foundations and Individual Donors
Aphorism Foundation
Laura and John Arnold
The bedari collective
Bernard & Anne Spitzer Charitable Trust
Climateworks Foundation
Greg Goff
Blue Horizons Foundation
The William and Flora Hewlett Foundation
David Leuschen
The Rockefeller Foundation
Ray Rothrock
Mike & Sofia Segal
Kimberley and Scott Sheffield
Catherine and Tracy Wolstencroft
Daniel Ziff

Executive Summary

Global concerns about meeting rising electricity demand while maintaining climate commitments have driven some policies to accelerate the deployment of energy technologies with lower greenhouse gas emissions, including nuclear power. Diversifying energy sources is also a national-security and economic-security interest for many countries, and in that vein the United States recently set a goal of achieving 400 gigawatts of domestic nuclear power by 2050, nearly four times its current level.

But the first new reactors built in the United States in decades—two Westinghouse AP1000s, Units 3 and 4, at the Vogtle plant in Georgia that started commercial operations in 2023 and 2024—took more than twice the estimated time to construct and at more than double the cost. This experience raises questions about nuclear power’s economic viability and therefore its role in the energy transition and energy diversification.

To better understand what went wrong so utilities and reactor consortia can reduce the chances of such consequential delays in future US reactor builds, the authors examined testimonies by Vogtle’s independent construction monitor (ICM). The ICM, Dr. William R. Jacobs Jr., reviewed the project’s progress and any issues impacting schedule or cost. Jacobs had a unique vantage point into the unfolding debacle throughout the process, and assessed that the project’s three primary sources of delay were the following:

  • Vogtle Units 3 and 4 lacked a realistic, achievable schedule. The integrated project schedule (IPS) used to manage the project and estimate commercial operation dates was both incomplete and based on incorrect or unrealistic assumptions.
  • Private entities involved in the project failed to adhere to the stringent quality assurance requirements of the US Nuclear Regulatory Commission (NRC). In particular, the use of a new facility in Lake Charles, Louisiana, with no previous nuclear-grade manufacturing experience created lasting problems.
  • Westinghouse lacked sufficient design completion at the start of the project and the design changed during construction. Both factors adversely impacted procurement and construction and the changes led to licensing conflicts between what the NRC had certified and what the consortium built.

For future reactor projects, utilities and reactor consortia can take the following corresponding actions to mitigate those sources of delay:

  • Require a complete Level 3 IPS with realistic, achievable inputs. If utilities are to bear schedule risks in the future, they should stipulate for an IPS of this kind at the earliest stages of the project and consider having a third party review it.
  • Require strong quality control measures at the outset of the project and use suppliers that have experience with nuclear-grade manufacturing. Utilities could perform due diligence to ensure all vendors have a record demonstrating the necessary capabilities.
  • Require a more complete design at the start of construction, and consider using the NRC’s two-part licensing pathway for first-of-a-kind deployment (which allows for less design specificity at the start, because the construction permit is sought well before details must be solidified for the operating license).
Our Work

Relevant
Publications

See All Work
Nuclear Energy

Insights into Construction Delays at the Vogtle Nuclear Plant: Primary Sources of Delay Identified by the Independent Construction Monitor

Report by Matt Bowen & Rama T. Ponangi • November 15, 2026